2jz Ge Vvti Timing Belt Install

Posted on  by 

Engine mechanical (2jz–gte) – valve clearance author: date: 1113 1997 supra (rm502u) 10. Reconnect engine wire protector to no.4 timing belt cover 11. Reinstall iac valve pipe 12. Reconnect engine wire protector to cowl top panel 13. Reinstall ignition coils assemblies (see page ig–7). Remove No.3 timing belt cover Remove the oil filter cap. Using a 5 mm hexagon wrench, remove the 6 bolts and timing belt cover. Remove No.2 timing belt cover Using a 5 mm hexagon wrench, remove the 3 bolts, timing belt cover and gasket. Remove drive belt tensioner Remove the 3 bolts and tensioner. It is a good time to do the timing belt and install cam gears as well. Brian Crower BC 2JZ-GE 2JZ-GTE VVTi Cams 2001-2005 IS300 1998-2001 SC300 GS300 Aristo.

Gently remove the factory unit away from the engine.

  • (note: when removing, a small amount of motor oil may leak out of area, Clean said area prior to installing the “Good Power” solenoid.

Once the performance solenoid has been installed, Re-install the 10mm mounting bolt back onto the solenoid bracket. Do not over torque the 10mm bolt when re- installing.

Once the unit has been bolted down, re-connect the solenoid plug harness to the unit.

** Ensure that the plug if firmly attached, damage or loose plug may affect driveability of vehicle. Repair or replace damage plug as needed**

Prior to starting vehicle make sure that your vehicle does not have any check engine lights, Check engine lights may affect the unit.

Once all components have been re-installed, you can now start the vehicle. Once the vehicle has been started please allow vehicle to warm up to operating temperature before driving.

** Inspect solenoid area for any oil leakage**

Please allow up to ~50-100 (+/-) miles of normal driving condition so that the factory computer system can adjust/ “re-learn” fully to the performance solenoid that has been installed.

*Actual performance increase and/or gains are not guaranteed.
Vehicle condition and health of engine may cause different results when using this product. Actual results may vary. *

This is a guide to replacing a cam gear/s on the 2JZGTE or 2JZGE engine.

Some of these steps can be used to replace the timing belt, but not all, in the future I hope to have a full article on that process.

The process and pictures were taken mostly on my 2JZGTE VVTi supra, there are a few pictures of my old 2JZGE also – the process is almost identical and can be followed for both turbo and non-turbo engine models. The same process can be followed on the non-vvti, the VVTi has only the exhaust side cam gear that can be replaced, the non-vvti can have the exhaust and intake cam gear swapped out.

2jz ge vvti timing belt installer

Sharemouse 3 keygen. I have also done this with the engine out which makes it a lot easier to get parts off, I may only briefly touch on some steps that I didn’t have to do, also if you’re going to do this then I suggest you do your timing belt and water pump if need be, good time to change your coolant and flush/bleed system once done also, plus any seals or maintenance items.

Tools required; (*Optional)

  • Torque wrench
  • Socket set and extension bars (10, 12, 17, 22 mm sizes)
  • Screw driver
  • Pliers
  • Jack and Stands (Safety First!)
  • Coolant *
  • Timing Belt *
  • Water Pump *
  • Cam seals *

Process;

  • Diagram
  • Disconnect the battery cables and clamp then remove the battery. Using a 10mm socket, remove the 3x 10mm bolts holding the battery tray in
  • Jack up car and put it safely on stands, get you 10mm socket and undo engine under cover (this will aid in removing radiator, removing fan, removing, shroud, disconnecting any plugs like electric fans if you have them, getting to timing belt tensioner)
Vvti

Diagram EM15 Part 1 –

  • Get the pliers and remove the clamps on the radiator hoses (Do one end and drain into bucket, do a coolant change while your at it)
  • Remove radiator, fan shroud (10mm bolts on radiator) and electric fans/plugs

2jz Gte Vvti Motor

Vvti

Diagram EM15 Part 2 –

  • Remove drive belt tensioner damper (2x 10mm bolts)

Diagram EM15 Part 3 –

  • Remove drive belt (Put socket over dampener bolt and push down clockwise to loosen off), remove clutch fan (4x 10mm nuts) – Don’t worry about where it mentions in step 3 to look at removing water pump pulley)
  • Remove timing belt cover (10mm allen heads) – Don’t worry about where it mentions in step 3 to look at removing water pump pulley, this is not required

Diagram EM15 Part 4 –

  • Not required for removal

Diagram EM15 Part 5 –

  • Remove the 5mm allen head bolts on the spark plug cover, remove spark plug cover (NA has 3x bolts, TT nas 12x bolts). Also remove any intake or piping/plumbing for easier access if required

Diagram Part 6 –

  • Remove the 5mm allen head bolts on the lower spark plug cover
  • You should now have something similar to this (TT top picture, NA bottom)

Diagram EM15 Part 7 –

  • Not required

Diagram EM16 Part 8 –

  • Follow instructions part 8a and 8bonly, making sure your timing is at TDC 0 (white line) also mark your timing belt with something to match up with the cam gear marks like a crayon that I used. You will see the marks on the cam gear will match up with the notches at the back too. If they don’t match up then turn the crank clockwise another 360 degrees until the cam gear notches line up and crank is at TDC 0.
  • Unless you have an SST then do this, loosen your cam bolt(s) here while you still have tension on the timing belt (Use 22mm socket on the crank bolt to stop it moving while you loosen the cam gear bolts, they are tight)

2jz Vvti Ecu

Diagram EM16 Part 9 –

  • 9 Only – Optional – There is no need to completely remove the timing belt
  • 9a – By now you should have access to the drive belt tensioner so loosen these 2 (12mm) bolts (DON’T TAKE THEM OFF), this will take tension off the belt, it is the rusty looking thing.
  • By now, you should have enough slack to easily remove the timing belt, if not loosen bolts a little more on the belt tensioner. BE VERY CAREFUL HERE!!! You don’t want to bump the cam gears or the crank pulley or you could seriously throw your timing off! Carefully back the cam gear bolt back out and set aside.
  • Take the cam gear off carefully and put new cam gear(s) on, making sure the teeth or the belt don’t move, the cam gear is keyed and can only go on one way, your marks should line up, if not make sure they do! (If your not VVTi do the other side too, but make sure you do one side at a time)

Diagram EM23 Part 9b, 10a and 10b –

  • From here you just need to put cam gear bolt back in and do up hand tight ensuring camshaft timing markings are correct

Diagram EM23 Part 11-

  • Not required unless you removed timing belt tensioner

Diagram EM23 Part 12-

  • Tighten torque drive belt tensioner bolts back up evenly to 20ft/lbs with a torque wrench, also making sure your belt is on evenly (look from above).
  • Next get 22mm wrench again and put on crank bolt and get torque wrench and do up cam gear bolt 59ft/lbs (using crank bolt to stop from moving)

2jz Vvti Valve Cover

  • As far as timing and tuning goes please use instructions provided or get your mechanic/tuner to do for you, make sure you use loctite on cam gear bolts.
  • Install everything back on and make sure TDC is at 0 and the cam gears line up with the marks, also make sure everything is put back together and you’re not missing screws and nuts that you put everywhere, also do a coolant flush/bleed system.

2jz Ge Vvti Turbo Build

  • Old cam gear out and new cam gear in – job complete!

Coments are closed